TickValue

E-mini Natural Gas Futures Contract Specifications (QG)

Energy futures are physically deliverable and settle against a specific grade at a specific location. Contract size, tick size and the delivery point all matter, because the quoted price refers to that grade at that hub.

Specifications

Contract unit2,500 mmBtu
ExchangeNYMEX/CME
SymbolQG
Tick size0.005
Tick value$12.50
Point value$2,500
Delivery monthsAll
SectorEnergies
Quote currency$

Margin is not listed here on purpose — the exchange revises it and every broker adds its own buffer. Check your broker's platform for the live figure. Use the margin calculator to estimate what a position will tie up.

Doing the tick math

One tick is 0.005 in the quoted price, which is $12.50 per contract. A move of one full point (1.00 in the quoted price) is worth $2,500, so there are 200 ticks in a point. Get those two numbers wrong and every risk calculation downstream is wrong, which is the point of the tick value guide.

Enter your own prices in the tick value and P/L calculator to see the dollar result for this contract without doing the arithmetic by hand.

Delivery months

All. Liquidity concentrates in the nearest active month; open interest migrates over a few weeks before expiry, which is what the roll mechanics guide walks through.

What one tick is worth at different position sizes

The per-tick figure scales linearly, which is the part most traders get wrong when they add contracts without re-checking risk.

PositionValue of 1 tickValue of 10 ticks
1 contract$12.50$125
2 contracts$25$250
5 contracts$62.50$625
10 contracts$125$1,250

Ten ticks on a QG contract is a move of 0.005 × 10 in the quoted price. If you want the P/L for a specific entry and exit rather than a tick multiple, put the prices into the tick value calculator.

Converting your stop into a dollar risk

Stops are set in price terms but risk is booked in dollars. Multiply the stop distance in ticks by the tick value — and then add commission, which is charged per contract per side and is not in the numbers below.

Stop distance1 contract5 contracts
5 ticks$62.50$312.50
10 ticks$125$625
20 ticks$250$1,250
40 ticks$500$2,500

On a 2,500 mmBtu contract, a 20-tick stop at one contract ties up $250 of risk before costs. At five contracts it is $1,250. This is why position size should follow the stop, not the other way round — the arithmetic is laid out in choosing a futures contract.

How margin is set on E-mini Natural Gas futures

Margin is not a property of the contract spec — it is a risk parameter the exchange recalculates periodically and that your broker then marks up. Two consequences follow:

What is fixed by the spec is the notional exposure: 2,500 mmBtu multiplied by the price. Margin is a percentage of that notional, which is why a higher price or a wider exchange buffer raises the cash requirement without the contract itself changing. The margin calculator takes your broker's number and converts it into "how many contracts can I hold"; the mechanics are in how futures margin works.

Where these numbers come from

Contract unit, tick size and delivery months are taken from the contract specifications published by NYMEX/CME. Exchanges occasionally change tick sizes and listing months, so before relying on this page for a live position, check the current spec sheet on the exchange's own product page or on your broker's platform. This page was last rebuilt on 15 November 2026.

What moves E-mini Natural Gas prices

This is context, not a recommendation. Nothing here tells you which way the market is going.

More energies contracts

Full list: all 135 contract specifications. Sizing maths: tick value calculator, margin calculator.

Frequently asked

What is the contract size of E-mini Natural Gas futures?

One QG contract represents 2,500 mmBtu. Every tick value and point value on this page follows from that quantity.

How much is one tick worth in QG futures?

One tick is a price move of 0.005, worth $12.50 per contract. A full point move (1.00 in the quoted price) is worth $2,500.

Which delivery months does QG trade?

All The front month carries most of the liquidity and open interest migrates a few weeks before expiry.